Roads Mauritius

Péage : Allégations de Pots-de-Vin à l’ICAC

Dénonciation de trois cas présumés pour un montant global de 3,3 millions d’euros (Rs 120 millions) en marge de l’octroi de ce contrat de Rs 30 milliards du Road Decongestion Programme

23 Feb 2013, motors.mega.mu

The First Phase of Ring Road Opened

The first phase of the ring road (Ring Road), produced at a cost of Rs 1.3 billion was made available Wednesday. The inauguration was made by Prime Minister Navin Ramgoolam, in the presence of the Minister of Public Infrastructure Anil Bachoo, and other guests.

23 Feb 2013, motors.mega.mu

Introduction Of Penalty Points: Ramgoolam, "Everyone will be Treated the Same Way"

The Prime Minister reiterated yesterday that there will be no exceptions in the context of the application of penalty points from April. "Everyone will be treated the same way as there will be one law for all and not more legislation," insisted Navin Ramgoolam.

22 Feb 2013, motors.mega.mu

New Road Inaugurated

The opening of this road was eagerly awaited. Anil Bachoo, Vice Prime Minister and Minister of Public Infrastructure, Thursday inaugurated the new road that bypasses the town of Valetta and goes towards Vuillemin Centre de Flacq, through Quartier Militaire.

22 Feb 2013, motors.mega.mu

Penalty Points: Effective April 1, Injunction Proposed by Opponents

The penalty points come into force on April 1. The minsitre Anil Bachoo confirmed in the second part of the Grand Journal of Radio Plus Tuesday. The common front of the transport sector remain unsatisfied, because the minister was adamant that all motorists will be housed in the same boat regarding the license points.

22 Feb 2013, motors.mega.mu

Montagne-Ory Road close: Two shuttles

After the inhabitants of Montagne-Ory have expressed their discontent Sunday, the authorities have decided to put two shuttles of the National Transport Corporation (NTC) at their disposal.

21 Feb 2013, motors.mega.mu

Ring Road Inauguration: Pedestrian Safety Forgotten at Sorèze Roundabout

The first part of the Ring Road will be inaugurated on Wednesday without the safety of pedestrians at the entrance Sorèze has been considered. There is no crosswalk or sidewalk for the people at the roundabout at the entrance to the neighborhood. The opening of the road will amplify the danger.

20 Feb 2013, motors.mega.mu

Landslide in Montagne-Ory "Stop Order" Against Construction Clavis Parking Lot

District Council of Moka issues a "stop order" against Clavis International Primary School prohibiting the construction of a parking area at the foot of the Montagne Ory. The direction of the privately denies any responsibility.

18 Feb 2013, motors.mega.mu

North: Road Gokhoola-L'Amitié Closed to Small Vehicles

The north of the country has been particularly wet Sunday with the result that several roads and houses are flooded.

18 Feb 2013, motors.mega.mu

New Rain Cause Flooding in The North, Roads Closed

Firefighters were Sunday afternoon many calls for help in the north. Houses were flooded again and just four days after the flood that paralyzed much of the country.

18 Feb 2013, motors.mega.mu

Road Closure Montagne Ory : Hundred People Show Their Anger

Ras-le-bol and frustration could be seen on the faces of the inhabitants of the town on Sunday afternoon.

18 Feb 2013, motors.mega.mu

Landslide in Montagne-Ory

Road Montagne-Ory will not be open to traffic soon. After landslides occurred last Tuesday, the authorities plan major work. However, it will, in an emergency, secure the house overlooking the turn.

16 Feb 2013, motors.mega.mu

Between and Surinam Souillac: New Bridge Operational

Souillac Bridge was reopened yesterday to 14 hours. The relief was generally on the side of the locals, who consider themselves "liberated weighing" huge. Since Tuesday, they were in fact forced to take the road to Mont-Blanc to go to Port Louis Curepipe or even to stop in Surinam to continue on foot to the bridge to take another bus.

16 Feb 2013, motors.mega.mu

Infrastructure : Mountain-Ory Road Remains Closed, Souillac Bridge Reopened Friday, Bridge in Baie-du-Tombeau Seriously Damaged

Mountain road leading to Ory Moka remains closed until further notice, while the bridge Souillac should be reopened to traffic Friday afternoon.

15 Feb 2013, motors.mega.mu

Souillac Bridge Operational Tomorrow

The Minister of Public Infrastructure attended the press conference today to announce that the bridge will be operational tomorrow Souillac and work on the drains in the village should begin today.

14 Feb 2013, motors.mega.mu

Infrastructures Routières: Plusieurs Routes et Ponts Fermés en Raison des Fortes Pluies

La circulation routière est grandement handicapée par les intempéries dans plusieurs régions de l’île. Les ponts et routes fermés forcent les automobilistes concernés à rebrousser chemin.

13 Feb 2013, motors.mega.mu

Landslides Moka: Road Montagne-Ory Closed for Traffic

Landslides occurred on slopes along the road from Montagne-Ory this morning. To this end, the road connecting Highway Moka to be closed to traffic until further notice.

13 Feb 2013, motors.mega.mu

Infrastructure Publique : Péage, Contrat de Rs 30 Milliards Gelé

L’Independent Review Panel (IRP), composé du Dr M. Allybokus, président, et des assesseurs, Denis Vellien et Esther Hanoomanjee, a émis deux ordres ayant des conséquences majeurs sur d’importants chantiers publics en ce début d’année.

12 Feb 2013, motors.mega.mu

Souillac Bridge Reopened for Traffic Wednesday Afternoon

The Minister of Public Infrastructure went to Souillac, in the morning on Tuesday 11 February, to see firsthand the damage to the bridge Souillac by heavy rain.

12 Feb 2013, motors.mega.mu

Souillac Bridge Closed for Traffic. Support Pillars Were Swept Away by Floods.

Souillac Bridge were in the night under the heavy rain. This region has recorded 114 mm of rain in the evening.

12 Feb 2013, motors.mega.mu